Transparent Factory

See PUTANER’s Houston facility and learn about ingredient traceability, manufacturing and quality checks.

Aerial photo of the PUTANER Houston facility
Aerial photo of the PUTANER Houston facility

Factory introduction

Explore PUTANER’s Houston facility through the brand film and the exterior visualization.

15827 Tuckerton Rd, Houston, TX 77095, USA

Production Display

Explore the group’s production archive, from workshop operations and lab work to filling and packaging.

Inside the production area
Inside the production area
Work at the production station
Work at the production station
Equipment operation and records
Equipment operation and records
Work on the bottling line
Work on the bottling line
Laboratory inspection
Laboratory inspection
Bottle filling line
Bottle filling line

Images from the PUTANER group production archive.

Quality across the production process

Ingredient traceability

Supplier and lot records connect incoming ingredients with the production batches that use them.

Production by format

Capsules, tablets and softgels have different production steps and finished-product specifications.

Quality checks

Project specifications guide the checks for ingredients, production and finished batches.

Production transparency

Supplier, process and packaging records show how the finished lot relates to earlier stages of production.

Images from the PUTANER group production archive.

Integrity in quality decisions

The group’s quality principles put product safety ahead of schedule and commercial pressure. They call for decisions based on the specifications and records for each batch.

Establish the criteria

Agree on ingredient identity, in-process checks and finished-product specifications before manufacturing begins.

Keep the records connected

Link supplier and ingredient lot records to production and packaging records so a finished lot can be traced.

Review before release

Use the recorded results and release criteria to decide whether a batch is ready. Keep the quality decision independent of commercial deadlines.

Factory Credentials

View the certificates, food facility registration and Texas company filings for PUTANER PHARMA INC.

GMP Certificate View document

GMP Certificate

American Quality Standards Registrars (AQSR)

Good Manufacturing Practice certificate for the supplement operations listed in the document.

Expiration date on certificate
HACCP Certificate View document

HACCP Certificate

American Quality Standards Registrars (AQSR)

Hazard analysis and critical control points for the operations described in the certificate.

Expiration date on certificate
ISO 22000:2018 Certificate View document

ISO 22000:2018 Certificate

Americo Quality Standards Registech Pvt. Ltd.

Food safety management system for the manufacturing and trading activities listed in the certificate.

Surveillance / expiry date
FDA Food Facility Registration View document

FDA Food Facility Registration

Registrar Corp

Registrar Corp’s confirmation of the Houston food facility registration.

Confirmation period shown
Texas Certificate of Filing View document

Texas Certificate of Filing

Texas Secretary of State

Certificate recording the filing of PUTANER PHARMA INC’s formation.

Effective date
Texas Food Manufacturer License View document

Texas Food Manufacturer License

Texas Department of State Health Services

Food manufacturer license for the Houston facility.

Expiration date on license
Halal Compliance Certificate View document

Halal Compliance Certificate

Euro Assessments & Certification Ltd.

Halal compliance applies within the manufacturing scope listed in the certificate.

Surveillance due date

The public preview of the FDA registration document masks its registration number and unique facility identifier.

Reviewing a manufacturing project

Product format, packaging and target market determine which specifications and supporting documents are relevant. Discuss these details with our team when preparing a project.

Explore manufacturing services
  • What ingredient and batch records are relevant?
  • What checks are specified for the finished product?
  • What packaging and label details need confirmation?